In Goswinowice, Poland, we are continuing with the fourth stage of the construction of the post-harvest line, which started on 30 April this year.
For BIOAGRA S.A., a major producer of bioethanol, we are building three new BROCK silos model E-07240 with a height of the cylindrical part of the silo of 32.5 m, which is the highest steel silo ever available! Each of the three silos has a storage capacity of 8,505 t and a diameter of 22.0 m.
The next step will be the connection to the distillery warehouse with SKANDIA 120 t/h, H-line+ series conveyors, this "Heavy-Duty" type series is designed for continuous year-round operation with a loading capacity of 30,000 tonnes per year. Redlers and elevators of this series are available in the performance range 60-600 t/h with robust construction and a very long service life.
We are very pleased with our long-term cooperation with BIOAGRA S.A., which started in the first phase in 2015.
The PAWLICA team wishes you every success